Tricycle Parts Set for BMW X5: Construction Sites
This tricycle parts set is the version most often ordered for construction sites on the BMW X5. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: reorders that did not match the approved sample, or a specification nobody had written down. Both come from a specification that was never written down.

Specification
| Product | Tricycle Parts Set |
|---|---|
| Vehicle application | BMW X5 |
| Intended use | Construction Sites |
| Base material | Bronze |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | E-mark |
Why this version
- Material — Bronze, chosen for the construction sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the BMW X5 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Air Freshener
- Specialized Vehicle Kit
- Headlight Bulb Kit
- Phone Holder
- Tow Rope
- Trailer Hitch
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; construction sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.
Ask for the current catalogue and the specification sheet for this line.






