Car Refrigerator for Mitsubishi L200: Wet Weather Riding
This car refrigerator is the version most often ordered for wet weather riding on the Mitsubishi L200. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: reorders that did not match the approved sample, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | Car Refrigerator |
|---|---|
| Vehicle application | Mitsubishi L200 |
| Intended use | Wet Weather Riding |
| Base material | Magnesium Alloy |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | TUV |
Why this version
- Material — Magnesium Alloy, chosen for the wet weather riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mitsubishi L200 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Steering Cover
- Reflector Set
- Fuel Dispenser
- Tricycle Parts Set
- Wheel Stop
- Cable Tie Set
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; wet weather riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.






