Snow Chain for Ford Everest: Construction Sites
This snow chain is the version most often ordered for construction sites on the Ford Everest. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: inconsistent hardness between lots, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | Snow Chain |
|---|---|
| Vehicle application | Ford Everest |
| Intended use | Construction Sites |
| Base material | Stainless Steel |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | SGS |
Why this version
- Material — Stainless Steel, chosen for the construction sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Ford Everest without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Fuel Dispenser
- Jump Starter
- Adhesive Tape Roll
- Sun Shade
- Wheel Stop
- Wiper Blade Set
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; construction sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.






