Phone Holder for Geely Coolray: Construction Sites
This phone holder is the version most often ordered for construction sites on the Geely Coolray. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or a specification nobody had written down. Both come from a specification that was never written down.

Specification
| Product | Phone Holder |
|---|---|
| Vehicle application | Geely Coolray |
| Intended use | Construction Sites |
| Base material | Carbon Steel |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | DOT |
Why this version
- Material — Carbon Steel, chosen for the construction sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Geely Coolray without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tow Rope
- Cargo Carrier
- Tricycle Parts Set
- Jump Starter
- Utility Trailer Kit
- Cable Tie Set
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; construction sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the DOT-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







