Car Refrigerator for Tesla Model 3: Adventure Travel
This car refrigerator is the version most often ordered for adventure travel on the Tesla Model 3. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: inconsistent hardness between lots, or packing that arrived crushed at the port. Both come from a specification that was never written down.

Specification
| Product | Car Refrigerator |
|---|---|
| Vehicle application | Tesla Model 3 |
| Intended use | Adventure Travel |
| Base material | Kevlar Composite |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — Kevlar Composite, chosen for the adventure travel duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Tesla Model 3 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Vacuum Cleaner
- Tricycle Cargo Box
- Reflector Set
- Tyre Inflator
- Air Freshener
- Snow Chain
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; adventure travel is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







