Wheel Chock for Hyundai Santa Fe: Heavy Load Hauling
This wheel chock is the version most often ordered for heavy load hauling on the Hyundai Santa Fe. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: reorders that did not match the approved sample, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | Wheel Chock |
|---|---|
| Vehicle application | Hyundai Santa Fe |
| Intended use | Heavy Load Hauling |
| Base material | Sintered Metal |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | REACH |
Why this version
- Material — Sintered Metal, chosen for the heavy load hauling duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Hyundai Santa Fe without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Fuel Dispenser
- Parking Lock
- Tire Gauge
- Valve Cap Set
- Snow Chain
- Bike Rack
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; heavy load hauling is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.






