Parking Lock for Great Wall Poer: Mountain Roads
This parking lock is the version most often ordered for mountain roads on the Great Wall Poer. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: reorders that did not match the approved sample, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Parking Lock |
|---|---|
| Vehicle application | Great Wall Poer |
| Intended use | Mountain Roads |
| Base material | Cast Iron |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | SAE J431 |
Why this version
- Material — Cast Iron, chosen for the mountain roads duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Great Wall Poer without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Jack Stand
- Bus Parts Set
- Roof Box
- Loading Ramp
- Car Vacuum Cleaner
- Trailer Hitch
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mountain roads is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Ask for the current catalogue and the specification sheet for this line.







