Car Organizer for Great Wall Poer: Food Delivery
This car organizer is the version most often ordered for food delivery on the Great Wall Poer. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: packing that arrived crushed at the port, or a fitment that looked right on paper and failed on the bench. Both come from a specification that was never written down.

Specification
| Product | Car Organizer |
|---|---|
| Vehicle application | Great Wall Poer |
| Intended use | Food Delivery |
| Base material | High Density Foam |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — High Density Foam, chosen for the food delivery duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Great Wall Poer without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Loading Ramp
- Tricycle Cargo Box
- Jack Stand
- Tyre Inflator
- Utility Trailer Kit
- Tricycle Axle
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; food delivery is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.






