Cable Tie Set for BMW 3 Series: Delivery Fleets
This cable tie set is the version most often ordered for delivery fleets on the BMW 3 Series. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: packing that arrived crushed at the port, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Cable Tie Set |
|---|---|
| Vehicle application | BMW 3 Series |
| Intended use | Delivery Fleets |
| Base material | Cast Iron |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | RoHS |
Why this version
- Material — Cast Iron, chosen for the delivery fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the BMW 3 Series without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Vacuum Cleaner
- Roof Box
- Phone Holder
- Secondhand Vehicle Stock
- Parking Lock
- Sun Shade
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; delivery fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.






