Steering Cover for Haval H6: Rural Transport
This steering cover is the version most often ordered for rural transport on the Haval H6. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: packing that arrived crushed at the port, or a specification nobody had written down. Both come from a specification that was never written down.

Specification
| Product | Steering Cover |
|---|---|
| Vehicle application | Haval H6 |
| Intended use | Rural Transport |
| Base material | Carbon Fibre Composite |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | REACH |
Why this version
- Material — Carbon Fibre Composite, chosen for the rural transport duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Haval H6 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Reflector Set
- Jump Starter
- Fuse Kit
- Bus Parts Set
- Loading Ramp
- Tire Gauge
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; rural transport is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







