Tricycle Cargo Box for RAM 1500: Weekend Riding
This tricycle cargo box is the version most often ordered for weekend riding on the RAM 1500. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: warranty claims traced back to a single lot, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | Tricycle Cargo Box |
|---|---|
| Vehicle application | RAM 1500 |
| Intended use | Weekend Riding |
| Base material | Nylon 66 |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | TUV |
Why this version
- Material — Nylon 66, chosen for the weekend riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the RAM 1500 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Phone Holder
- Work Lamp
- Car Vacuum Cleaner
- Fuel Dispenser
- License Plate Frame
- Utility Trailer Kit
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; weekend riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







