Trailer Hitch for Toyota HiAce: Delivery Fleets
This trailer hitch is the version most often ordered for delivery fleets on the Toyota HiAce. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or reorders that did not match the approved sample. Both come from a specification that was never written down.

Specification
| Product | Trailer Hitch |
|---|---|
| Vehicle application | Toyota HiAce |
| Intended use | Delivery Fleets |
| Base material | Reinforced Nylon |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | E-mark |
Why this version
- Material — Reinforced Nylon, chosen for the delivery fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Toyota HiAce without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Roof Box
- Secondhand Vehicle Stock
- Car Vacuum Cleaner
- Jack Stand
- Car Charger
- Car Air Purifier
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; delivery fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







