Floor Mat for Mazda BT-50: Off-Road Trails
This floor mat is the version most often ordered for off-road trails on the Mazda BT-50. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: documentation that arrived after the container shipped, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | Floor Mat |
|---|---|
| Vehicle application | Mazda BT-50 |
| Intended use | Off-Road Trails |
| Base material | Brass |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | TUV |
Why this version
- Material — Brass, chosen for the off-road trails duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mazda BT-50 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Sun Shade
- Car Charger
- Car Organizer
- Seat Cover
- Roof Box
- Wheel Chock
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; off-road trails is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.






