Gas Station Nozzle for Kia Sorento: Farm Use
This gas station nozzle is the version most often ordered for farm use on the Kia Sorento. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: packing that arrived crushed at the port, or packing that arrived crushed at the port. Both come from a specification that was never written down.

Specification
| Product | Gas Station Nozzle |
|---|---|
| Vehicle application | Kia Sorento |
| Intended use | Farm Use |
| Base material | Brass |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | ISO 9001 |
Why this version
- Material — Brass, chosen for the farm use duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Kia Sorento without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Jack Stand
- Snow Chain
- Secondhand Vehicle Stock
- Gas Station Nozzle
- Tyre Inflator
- License Plate Frame
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; farm use is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







