Gas Station Nozzle for GMC Sierra: Food Delivery
This gas station nozzle is the version most often ordered for food delivery on the GMC Sierra. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: lead time that slipped twice before bulk started, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Gas Station Nozzle |
|---|---|
| Vehicle application | GMC Sierra |
| Intended use | Food Delivery |
| Base material | PU Leather |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | IATF 16949 |
Why this version
- Material — PU Leather, chosen for the food delivery duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the GMC Sierra without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tricycle Axle
- Tyre Inflator
- Floor Mat
- Gas Station Nozzle
- Car Charger
- Work Lamp
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; food delivery is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







