Tire Gauge for Mazda BT-50: Mining Sites
This tire gauge is the version most often ordered for mining sites on the Mazda BT-50. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a specification nobody had written down, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Tire Gauge |
|---|---|
| Vehicle application | Mazda BT-50 |
| Intended use | Mining Sites |
| Base material | Forged Aluminium |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | REACH |
Why this version
- Material — Forged Aluminium, chosen for the mining sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mazda BT-50 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Charger
- Tire Gauge
- Tricycle Cargo Box
- Cargo Net
- Gas Station Nozzle
- Floor Mat
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mining sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.






