Wheel Chock for Haval H6: Delivery Fleets
This wheel chock is the version most often ordered for delivery fleets on the Haval H6. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Wheel Chock |
|---|---|
| Vehicle application | Haval H6 |
| Intended use | Delivery Fleets |
| Base material | Semi-Metallic Compound |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | SGS |
Why this version
- Material — Semi-Metallic Compound, chosen for the delivery fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Haval H6 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Cargo Carrier
- Floor Mat
- Car Fan
- Seat Cover
- Utility Trailer Kit
- Jump Starter
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; delivery fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
Ask for the current catalogue and the specification sheet for this line.







