Air Freshener for Ford Everest: Wet Weather Riding
This air freshener is the version most often ordered for wet weather riding on the Ford Everest. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: lead time that slipped twice before bulk started, or reorders that did not match the approved sample. Both come from a specification that was never written down.

Specification
| Product | Air Freshener |
|---|---|
| Vehicle application | Ford Everest |
| Intended use | Wet Weather Riding |
| Base material | Chromed Steel |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | IATF 16949 |
Why this version
- Material — Chromed Steel, chosen for the wet weather riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Ford Everest without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Antenna
- Headlight Bulb Kit
- Wheel Stop
- Tricycle Cargo Box
- Jump Starter
- Car Vacuum Cleaner
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; wet weather riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.






