Reflector Set for Hyundai Tucson: Mountain Roads
This reflector set is the version most often ordered for mountain roads on the Hyundai Tucson. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: documentation that arrived after the container shipped, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Reflector Set |
|---|---|
| Vehicle application | Hyundai Tucson |
| Intended use | Mountain Roads |
| Base material | Bronze |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | IATF 16949 |
Why this version
- Material — Bronze, chosen for the mountain roads duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Hyundai Tucson without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Air Freshener
- Steering Cover
- Jack Stand
- Car Fan
- Fuse Kit
- Loading Ramp
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mountain roads is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.






