License Plate Frame for Chevrolet Captiva: Roadside Assistance
This license plate frame is the version most often ordered for roadside assistance on the Chevrolet Captiva. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a specification nobody had written down, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | License Plate Frame |
|---|---|
| Vehicle application | Chevrolet Captiva |
| Intended use | Roadside Assistance |
| Base material | High Density Foam |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | RoHS |
Why this version
- Material — High Density Foam, chosen for the roadside assistance duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Chevrolet Captiva without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Rice Cooker
- Fuel Dispenser
- Utility Trailer Kit
- Floor Mat
- Trailer Hitch
- Wheel Stop
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; roadside assistance is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.






