Car Refrigerator for Jeep Wrangler: Long-Distance Touring
This car refrigerator is the version most often ordered for long-distance touring on the Jeep Wrangler. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: warranty claims traced back to a single lot, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Car Refrigerator |
|---|---|
| Vehicle application | Jeep Wrangler |
| Intended use | Long-Distance Touring |
| Base material | Stainless Steel |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — Stainless Steel, chosen for the long-distance touring duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Jeep Wrangler without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Bus Parts Set
- Container Securing Kit
- Car Rice Cooker
- Work Lamp
- Car Charger
- Car Vacuum Cleaner
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; long-distance touring is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







