Loading Ramp for Mitsubishi Pajero: Rental Fleets
This loading ramp is the version most often ordered for rental fleets on the Mitsubishi Pajero. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: inconsistent hardness between lots, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Loading Ramp |
|---|---|
| Vehicle application | Mitsubishi Pajero |
| Intended use | Rental Fleets |
| Base material | Semi-Metallic Compound |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | RoHS |
Why this version
- Material — Semi-Metallic Compound, chosen for the rental fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mitsubishi Pajero without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Bike Rack
- Floor Mat
- Parking Lock
- Gas Station Nozzle
- Sun Shade
- Secondhand Vehicle Stock
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; rental fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







