Sun Shade for Volvo XC60: Rental Fleets
This sun shade is the version most often ordered for rental fleets on the Volvo XC60. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Sun Shade |
|---|---|
| Vehicle application | Volvo XC60 |
| Intended use | Rental Fleets |
| Base material | Magnesium Alloy |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | RoHS |
Why this version
- Material — Magnesium Alloy, chosen for the rental fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Volvo XC60 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Work Lamp
- Fuse Kit
- Loading Ramp
- Cargo Carrier
- Utility Trailer Kit
- Fuel Dispenser
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; rental fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.






