Welcome to Auto, Motorcycle Parts & Accessories official website!
Jump Starter for Chery Tiggo: Heavy Load Hauling

Jump Starter for Chery Tiggo: Heavy Load Hauling

Jump Starter for Chery Tiggo: Heavy Load HaulingThis jump starter is the version most often ordered for heavy load hauling on the Chery Tiggo. It is supplied to a written specification covering.

Contact Number:
Product Details

Jump Starter for Chery Tiggo: Heavy Load Hauling

This jump starter is the version most often ordered for heavy load hauling on the Chery Tiggo. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.

What usually goes wrong is ordinary: a specification nobody had written down, or a specification nobody had written down. Both come from a specification that was never written down.

Jump Starter for Chery Tiggo

Specification

ProductJump Starter
Vehicle applicationChery Tiggo
Intended useHeavy Load Hauling
Base materialKevlar Composite
MOQ3,000 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceIATF 16949

Why this version

  • Material — Kevlar Composite, chosen for the heavy load hauling duty cycle rather than for showroom appearance.
  • Capacity — sized for continuous use, not for intermittent demonstration use.
  • Mounting — fixed to the Chery Tiggo without modification to the vehicle.
  • Service — wearing parts are replaceable without replacing the whole unit.
  • Packing — carton sized for a warehouse shelf, marked to your barcode.

Jump Starter in use

Related lines

  • Loading Ramp
  • Car Refrigerator
  • Gas Station Nozzle
  • Reflector Set
  • Fuel Dispenser
  • Fuse Kit

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Ordering checklist

  1. Confirm the model year, market version and mounting points.
  2. State the duty cycle; heavy load hauling is not the same specification as occasional use.
  3. Approve a sample built from bulk material.
  4. Fix packing and marking before the first container.
  5. Inspect before balance payment.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top