Wheel Chock for Hyundai Santa Fe: Airport Ground Fleets
This wheel chock is the version most often ordered for airport ground fleets on the Hyundai Santa Fe. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: packing that arrived crushed at the port, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Wheel Chock |
|---|---|
| Vehicle application | Hyundai Santa Fe |
| Intended use | Airport Ground Fleets |
| Base material | Ceramic Composite |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | ISO/TS 16949 |
Why this version
- Material — Ceramic Composite, chosen for the airport ground fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Hyundai Santa Fe without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Gas Station Nozzle
- Tricycle Axle
- Phone Holder
- Reflector Set
- Jump Starter
- Tricycle Cargo Box
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; airport ground fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







