Wheel Stop for Changan CS75: Weekend Riding
This wheel stop is the version most often ordered for weekend riding on the Changan CS75. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a fitment that looked right on paper and failed on the bench, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | Wheel Stop |
|---|---|
| Vehicle application | Changan CS75 |
| Intended use | Weekend Riding |
| Base material | Semi-Metallic Compound |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | E-mark |
Why this version
- Material — Semi-Metallic Compound, chosen for the weekend riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Changan CS75 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tyre Inflator
- Air Freshener
- Dash Camera
- Cable Tie Set
- Gas Station Nozzle
- Roof Box
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; weekend riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







