Headlight Bulb Kit for Hyundai Tucson: Long-Distance Touring
This headlight bulb kit is the version most often ordered for long-distance touring on the Hyundai Tucson. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: packing that arrived crushed at the port, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Headlight Bulb Kit |
|---|---|
| Vehicle application | Hyundai Tucson |
| Intended use | Long-Distance Touring |
| Base material | Sintered Metal |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | SGS |
Why this version
- Material — Sintered Metal, chosen for the long-distance touring duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Hyundai Tucson without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- License Plate Frame
- Wheel Stop
- Tricycle Axle
- Tyre Inflator
- Car Vacuum Cleaner
- Gas Station Nozzle
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; long-distance touring is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







