Tyre Inflator for Audi Q5: Motocross
This tyre inflator is the version most often ordered for motocross on the Audi Q5. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: reorders that did not match the approved sample, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Tyre Inflator |
|---|---|
| Vehicle application | Audi Q5 |
| Intended use | Motocross |
| Base material | Silicone |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | SGS |
Why this version
- Material — Silicone, chosen for the motocross duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Audi Q5 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Bus Parts Set
- Loading Ramp
- Car Air Purifier
- Bike Rack
- License Plate Frame
- Jump Starter
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; motocross is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.






