Parking Lock for Mitsubishi Pajero: Night Riding
This parking lock is the version most often ordered for night riding on the Mitsubishi Pajero. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: documentation that arrived after the container shipped, or reorders that did not match the approved sample. Both come from a specification that was never written down.

Specification
| Product | Parking Lock |
|---|---|
| Vehicle application | Mitsubishi Pajero |
| Intended use | Night Riding |
| Base material | Powder Coated Steel |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | RoHS |
Why this version
- Material — Powder Coated Steel, chosen for the night riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mitsubishi Pajero without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Cargo Carrier
- Cable Tie Set
- Jack Stand
- Floor Mat
- Work Lamp
- Steering Cover
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; night riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







