Work Lamp for Jeep Wrangler: Rural Transport
This work lamp is the version most often ordered for rural transport on the Jeep Wrangler. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: documentation that arrived after the container shipped, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | Work Lamp |
|---|---|
| Vehicle application | Jeep Wrangler |
| Intended use | Rural Transport |
| Base material | PVC Coated Fabric |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | DOT |
Why this version
- Material — PVC Coated Fabric, chosen for the rural transport duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Jeep Wrangler without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tyre Inflator
- Tricycle Parts Set
- Tow Rope
- Air Freshener
- Wheel Stop
- Floor Mat
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; rural transport is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the DOT-compliant build instead of a fresh interpretation.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







