Car Charger for Geely Coolray: Mountain Roads
This car charger is the version most often ordered for mountain roads on the Geely Coolray. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: documentation that arrived after the container shipped, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | Car Charger |
|---|---|
| Vehicle application | Geely Coolray |
| Intended use | Mountain Roads |
| Base material | Polypropylene |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | CCC |
Why this version
- Material — Polypropylene, chosen for the mountain roads duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Geely Coolray without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tire Gauge
- Car Charger
- Floor Mat
- Snow Chain
- Utility Trailer Kit
- Adhesive Tape Roll
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mountain roads is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







