Phone Holder for Ford Ranger: Rural Transport
This phone holder is the version most often ordered for rural transport on the Ford Ranger. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a specification nobody had written down, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Phone Holder |
|---|---|
| Vehicle application | Ford Ranger |
| Intended use | Rural Transport |
| Base material | Chromed Steel |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — Chromed Steel, chosen for the rural transport duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Ford Ranger without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Trim Clip Set
- Wheel Stop
- License Plate Frame
- Car Fan
- Roof Box
- Adhesive Tape Roll
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; rural transport is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







