Trailer Hitch for Great Wall Poer: Roadside Assistance
This trailer hitch is the version most often ordered for roadside assistance on the Great Wall Poer. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Trailer Hitch |
|---|---|
| Vehicle application | Great Wall Poer |
| Intended use | Roadside Assistance |
| Base material | Semi-Metallic Compound |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | TUV |
Why this version
- Material — Semi-Metallic Compound, chosen for the roadside assistance duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Great Wall Poer without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Parking Barrier
- Snow Chain
- Fuse Kit
- Car Charger
- Reflector Set
- Tricycle Axle
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; roadside assistance is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







