Snow Chain for Citroen C5 Aircross: Construction Sites
This snow chain is the version most often ordered for construction sites on the Citroen C5 Aircross. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Snow Chain |
|---|---|
| Vehicle application | Citroen C5 Aircross |
| Intended use | Construction Sites |
| Base material | Zinc Plated Steel |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — Zinc Plated Steel, chosen for the construction sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Citroen C5 Aircross without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Fuse Kit
- Cable Tie Set
- Tow Rope
- Tire Gauge
- Phone Holder
- Loading Ramp
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; construction sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Ask for the current catalogue and the specification sheet for this line.






