Cargo Net for Volvo XC60: Ride-Hailing Fleets
This cargo net is the version most often ordered for ride-hailing fleets on the Volvo XC60. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | Cargo Net |
|---|---|
| Vehicle application | Volvo XC60 |
| Intended use | Ride-Hailing Fleets |
| Base material | Sintered Metal |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | DOT |
Why this version
- Material — Sintered Metal, chosen for the ride-hailing fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Volvo XC60 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tricycle Parts Set
- Parking Lock
- Car Refrigerator
- Specialized Vehicle Kit
- Loading Ramp
- Cable Tie Set
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; ride-hailing fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the DOT-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







