Parking Lock for Nissan X-Trail: Heavy Load Hauling
This parking lock is the version most often ordered for heavy load hauling on the Nissan X-Trail. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: inconsistent hardness between lots, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Parking Lock |
|---|---|
| Vehicle application | Nissan X-Trail |
| Intended use | Heavy Load Hauling |
| Base material | Sintered Metal |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | IATF 16949 |
Why this version
- Material — Sintered Metal, chosen for the heavy load hauling duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Nissan X-Trail without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Rice Cooker
- Parking Barrier
- Air Freshener
- Adhesive Tape Roll
- Wheel Stop
- Roof Box
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; heavy load hauling is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







