Headlight Bulb Kit for Toyota Land Cruiser: Airport Ground Fleets
This headlight bulb kit is the version most often ordered for airport ground fleets on the Toyota Land Cruiser. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: inconsistent hardness between lots, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Headlight Bulb Kit |
|---|---|
| Vehicle application | Toyota Land Cruiser |
| Intended use | Airport Ground Fleets |
| Base material | Nylon 66 |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | TUV |
Why this version
- Material — Nylon 66, chosen for the airport ground fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Toyota Land Cruiser without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Wheel Stop
- Fuel Dispenser
- Headlight Bulb Kit
- Loading Ramp
- Sun Shade
- License Plate Frame
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; airport ground fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







