Utility Trailer Kit for Mitsubishi L200: Daily Commuting
This utility trailer kit is the version most often ordered for daily commuting on the Mitsubishi L200. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or a fitment that looked right on paper and failed on the bench. Both come from a specification that was never written down.

Specification
| Product | Utility Trailer Kit |
|---|---|
| Vehicle application | Mitsubishi L200 |
| Intended use | Daily Commuting |
| Base material | Titanium Alloy |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | CCC |
Why this version
- Material — Titanium Alloy, chosen for the daily commuting duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mitsubishi L200 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Trim Clip Set
- Reflector Set
- Wheel Chock
- Tow Rope
- Container Securing Kit
- Air Freshener
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; daily commuting is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.






