Adhesive Tape Roll for Geely Coolray: Security Patrols
This adhesive tape roll is the version most often ordered for security patrols on the Geely Coolray. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: documentation that arrived after the container shipped, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Adhesive Tape Roll |
|---|---|
| Vehicle application | Geely Coolray |
| Intended use | Security Patrols |
| Base material | Neoprene |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — Neoprene, chosen for the security patrols duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Geely Coolray without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tricycle Axle
- Gas Station Nozzle
- Tire Gauge
- Wheel Chock
- Headlight Bulb Kit
- License Plate Frame
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; security patrols is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







