Jack Stand for Peugeot 3008: Wet Weather Riding
This jack stand is the version most often ordered for wet weather riding on the Peugeot 3008. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: documentation that arrived after the container shipped, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | Jack Stand |
|---|---|
| Vehicle application | Peugeot 3008 |
| Intended use | Wet Weather Riding |
| Base material | High Density Foam |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | SGS |
Why this version
- Material — High Density Foam, chosen for the wet weather riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Peugeot 3008 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Headlight Bulb Kit
- Gas Station Nozzle
- Snow Chain
- Roof Box
- Parking Barrier
- Tow Rope
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; wet weather riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







