Loading Ramp for Mercedes-Benz G-Class: Mining Sites
This loading ramp is the version most often ordered for mining sites on the Mercedes-Benz G-Class. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: warranty claims traced back to a single lot, or a fitment that looked right on paper and failed on the bench. Both come from a specification that was never written down.

Specification
| Product | Loading Ramp |
|---|---|
| Vehicle application | Mercedes-Benz G-Class |
| Intended use | Mining Sites |
| Base material | Carbon Fibre Composite |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | E-mark |
Why this version
- Material — Carbon Fibre Composite, chosen for the mining sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mercedes-Benz G-Class without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Air Freshener
- Tricycle Parts Set
- Headlight Bulb Kit
- Car Air Purifier
- Loading Ramp
- Car Antenna
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mining sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.






