Welcome to Auto, Motorcycle Parts & Accessories official website!
Reflector Set for Mitsubishi L200: Mining Sites

Reflector Set for Mitsubishi L200: Mining Sites

Reflector Set for Mitsubishi L200: Mining SitesThis reflector set is the version most often ordered for mining sites on the Mitsubishi L200. It is supplied to a written specification covering.

Contact Number:
Product Details

Reflector Set for Mitsubishi L200: Mining Sites

This reflector set is the version most often ordered for mining sites on the Mitsubishi L200. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.

What usually goes wrong is ordinary: a specification nobody had written down, or reorders that did not match the approved sample. Both come from a specification that was never written down.

Reflector Set for Mitsubishi L200

Specification

ProductReflector Set
Vehicle applicationMitsubishi L200
Intended useMining Sites
Base materialPowder Coated Steel
MOQ500 pieces per specification
Sampling14 working days, 3 days per revision
ComplianceISO 9001

Why this version

  • Material — Powder Coated Steel, chosen for the mining sites duty cycle rather than for showroom appearance.
  • Capacity — sized for continuous use, not for intermittent demonstration use.
  • Mounting — fixed to the Mitsubishi L200 without modification to the vehicle.
  • Service — wearing parts are replaceable without replacing the whole unit.
  • Packing — carton sized for a warehouse shelf, marked to your barcode.

Reflector Set in use

Related lines

  • Work Lamp
  • Utility Trailer Kit
  • License Plate Frame
  • Adhesive Tape Roll
  • Tricycle Cargo Box
  • Seat Cover

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Ordering checklist

  1. Confirm the model year, market version and mounting points.
  2. State the duty cycle; mining sites is not the same specification as occasional use.
  3. Approve a sample built from bulk material.
  4. Fix packing and marking before the first container.
  5. Inspect before balance payment.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top