Roof Box for Toyota Corolla: Mining Sites
This roof box is the version most often ordered for mining sites on the Toyota Corolla. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a specification nobody had written down, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Roof Box |
|---|---|
| Vehicle application | Toyota Corolla |
| Intended use | Mining Sites |
| Base material | Semi-Metallic Compound |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | TUV |
Why this version
- Material — Semi-Metallic Compound, chosen for the mining sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Toyota Corolla without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Loading Ramp
- Snow Chain
- Secondhand Vehicle Stock
- License Plate Frame
- Tyre Inflator
- Car Air Purifier
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mining sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.






