Parking Barrier for Skoda Octavia: Night Riding
This parking barrier is the version most often ordered for night riding on the Skoda Octavia. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Parking Barrier |
|---|---|
| Vehicle application | Skoda Octavia |
| Intended use | Night Riding |
| Base material | Cast Iron |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | ISO/TS 16949 |
Why this version
- Material — Cast Iron, chosen for the night riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Skoda Octavia without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Cable Tie Set
- Valve Cap Set
- Fuse Kit
- Tricycle Axle
- Wheel Chock
- Air Freshener
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; night riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







