Tire Gauge for Jeep Wrangler: Construction Sites
This tire gauge is the version most often ordered for construction sites on the Jeep Wrangler. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Tire Gauge |
|---|---|
| Vehicle application | Jeep Wrangler |
| Intended use | Construction Sites |
| Base material | Semi-Metallic Compound |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — Semi-Metallic Compound, chosen for the construction sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Jeep Wrangler without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Fan
- Seat Cover
- Bike Rack
- Tyre Inflator
- Car Vacuum Cleaner
- Container Securing Kit
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; construction sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







