Valve Cap Set for Nissan X-Trail: Ride-Hailing Fleets
This valve cap set is the version most often ordered for ride-hailing fleets on the Nissan X-Trail. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or premature wear on the first batch. Both come from a specification that was never written down.

Specification
| Product | Valve Cap Set |
|---|---|
| Vehicle application | Nissan X-Trail |
| Intended use | Ride-Hailing Fleets |
| Base material | PU Leather |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | TUV |
Why this version
- Material — PU Leather, chosen for the ride-hailing fleets duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Nissan X-Trail without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Snow Chain
- Fuse Kit
- Car Organizer
- Loading Ramp
- Wheel Cover
- Wiper Blade Set
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; ride-hailing fleets is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
Ask for the current catalogue and the specification sheet for this line.







