Cargo Net for Ford Transit: Construction Sites
This cargo net is the version most often ordered for construction sites on the Ford Transit. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a supplier who changed material without saying so, or packing that arrived crushed at the port. Both come from a specification that was never written down.

Specification
| Product | Cargo Net |
|---|---|
| Vehicle application | Ford Transit |
| Intended use | Construction Sites |
| Base material | ABS Plastic |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | E-mark |
Why this version
- Material — ABS Plastic, chosen for the construction sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Ford Transit without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Jack Stand
- Gas Station Nozzle
- Specialized Vehicle Kit
- License Plate Frame
- Fuel Dispenser
- Headlight Bulb Kit
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; construction sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.






