Gas Station Nozzle for Geely Coolray: Mining Sites
This gas station nozzle is the version most often ordered for mining sites on the Geely Coolray. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: warranty claims traced back to a single lot, or inconsistent hardness between lots. Both come from a specification that was never written down.

Specification
| Product | Gas Station Nozzle |
|---|---|
| Vehicle application | Geely Coolray |
| Intended use | Mining Sites |
| Base material | Carbon Steel |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | REACH |
Why this version
- Material — Carbon Steel, chosen for the mining sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Geely Coolray without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Tow Rope
- Car Air Purifier
- Adhesive Tape Roll
- Wiper Blade Set
- Steering Cover
- Tyre Inflator
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mining sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.






