Fuel Dispenser for Chery Tiggo: Wet Weather Riding
This fuel dispenser is the version most often ordered for wet weather riding on the Chery Tiggo. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: warranty claims traced back to a single lot, or packing that arrived crushed at the port. Both come from a specification that was never written down.

Specification
| Product | Fuel Dispenser |
|---|---|
| Vehicle application | Chery Tiggo |
| Intended use | Wet Weather Riding |
| Base material | Powder Coated Steel |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — Powder Coated Steel, chosen for the wet weather riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Chery Tiggo without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Jump Starter
- Bike Rack
- Tire Gauge
- Tricycle Axle
- Car Vacuum Cleaner
- Phone Holder
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; wet weather riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







