Welcome to Auto, Motorcycle Parts & Accessories official website!
Loading Ramp for Haval H6: Heavy Load Hauling

Loading Ramp for Haval H6: Heavy Load Hauling

Loading Ramp for Haval H6: Heavy Load HaulingThis loading ramp is the version most often ordered for heavy load hauling on the Haval H6. It is supplied to a written specification covering material,.

Contact Number:
Product Details

Loading Ramp for Haval H6: Heavy Load Hauling

This loading ramp is the version most often ordered for heavy load hauling on the Haval H6. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.

What usually goes wrong is ordinary: a supplier who changed material without saying so, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Loading Ramp for Haval H6

Specification

ProductLoading Ramp
Vehicle applicationHaval H6
Intended useHeavy Load Hauling
Base materialChromed Steel
MOQ1,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceSGS

Why this version

  • Material — Chromed Steel, chosen for the heavy load hauling duty cycle rather than for showroom appearance.
  • Capacity — sized for continuous use, not for intermittent demonstration use.
  • Mounting — fixed to the Haval H6 without modification to the vehicle.
  • Service — wearing parts are replaceable without replacing the whole unit.
  • Packing — carton sized for a warehouse shelf, marked to your barcode.

Loading Ramp in use

Related lines

  • Gas Station Nozzle
  • Jump Starter
  • Car Charger
  • Car Fan
  • Trim Clip Set
  • Car Vacuum Cleaner

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Ordering checklist

  1. Confirm the model year, market version and mounting points.
  2. State the duty cycle; heavy load hauling is not the same specification as occasional use.
  3. Approve a sample built from bulk material.
  4. Fix packing and marking before the first container.
  5. Inspect before balance payment.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top